Loker Sebagai Construction Manager di

Construction Manager di

DESKRIPSI LOWONGAN KERJA

Informasi Tambahan Lowongan Kerja

Tingkat Pekerjaan :
Kualifikasi :

Report to COO

Subordinate: Quantity Surveyor & Estimator Team, Site Manager, Site Supervisor,

Collaboration with: Procurement &Logistic Head, HRM, Surveyor, HSE Manager, Engineering Team.

 

Brief :
Project Construction Manager is responsible for overseeing a number of different types of construction projects. They will lead the project from initiation to close, hiring subcontractors, working with vendors and tracking inventory of equipment and materials. This person should be knowledgeable about regulations, permits and project management methodology. They should also work well with others, be highly organized and detail-oriented, meet deadlines and strive to stay within budget.

 

Responsibilities :

  • Define and handling the project scope (BOQ), budget and detailed schedule with project deliverables and milestones
  • Keep inventory of tools, equipment and machinery
  • Manage resources such as construction materials, construction workers and equipment
  • Allocate and manage resource logistics
  • Design Quality Management System to ensure the building meet the corporate and building code standards
  • Creating daily status(plan/progress) reports, Weekly and Monthly reports
  • Monitoring and Calculating Progress of the Project, mirroring that in general schedule
  • Oversee the performance of sub-contractors, site manager and other members  of the construction team
  • Obtain building permits, licenses and meet code regulations
  • Collaborating with HSE to maintain health and safety standards
  • Calculating Project Quantity Base on Design Drawing and Technical Specification
  • Making detailing Project Scheduling for weekly and Monthly
  • Teaching Standard Quality of Project to all Project Staff
  • Auditing the Project Quality Documents
  • Providing Method Statements and Quality control at the Field Project
  • Identifying and managing of Project Critical Risks
  • Estimating and Managing Man Power, Material, and Equipment that required on the Project
  • Direct and ongoing management of the construction process at the site, ensuring proper technology for all types of work, controlling the quality of construction, ensuring quality control procedures. 
  •  Ensuring timely execution of works, as well as optimal solutions to optimize the budget and catch up construction deadlines.
  • Managing and coordinating the design team in the office, ensuring timely and complete design documentation.
  • Preparing detailed reports on all risks, problems, delays, missing documentation, recommendations for early resolution.
  • Advance planning, sourcing and engagement of manpower to ensure proper and timely work deliverables
  • Monitoring of contractors and suppliers, searching for the best offers, conducting tender procedures, ensuring timely delivery of materials and equipment

 

Skills & Qualifications :

  • Strong team management and leadership skills
  • Problem-solving and conflict-resolution skills
  • Excellent written and verbal communication skills
  • Project management skills such as time management, project budgeting, resource management and project scheduling
  • Bachelor’s degree in architecture, civil engineering, construction management or related field
  • Strong knowledge of construction management best practices
  • Fluency in software programs related to construction management, including project management software
  • Familiar with current with rules and regulations related to construction
  • Five years of project management experience in the construction industry
  • Years of construction management experience managing budgets and schedules
  • Prior experience managing a construction site
  • Proven risk management experience in construction projects
  • Hold Management Project Certification “SKA Ahli Bangunan Gedung Level Madya”

 

Key of Performance Indicators:

1.Budget Variance

This project management KPI focuses on the difference between the planned and actual project budget.

2.Cost Variance

The cost indicator is closely related to the budget KPI, as it shows actual costs vs. the planned ones.

3.Schedule variance

current progress against the schedule base line to determine whether the project is ahead or behind schedule.

4.Planned hours vs. actual

This KPI measures the time spent to reach the desired level of progress compared to the time the project manager estimated it would take.

5.Resource Capacity

This metric helps you better organize your team’s work by comparing the number of employees working on the project vs. their available time.

6.Quality Control Design such : Work Methods, QC inspection list

These can helps daily workers works properly under supervising site managers.

Pengalaman Kerja :
Jenis Pekerjaan : Kontrak
Spesialisasi Pekerjaan : Konstruksi / 1206

Informasi perusahaan Pemberi Kerja,

Informasi Tambahan Perusahaan

Ukuran Perusahaan :
Waktu Proses Lamaran :
Industri : Konstruksi
Tunjangan dan Lain-lain :
Lokasi : Badung